Re-engineering is an appropriate replacement for benchmarking when:
|
A. tour process is fairly strong relative to best-in-class. |
||
|
B. the best-in-class is not in your industry. |
||
|
C. your process is not in statistical control, i.e., is unstable. |
||
|
D. best-in-class is unwilling to cooperate. |
||
Reset Selection
|
Question 2 of 20 |
5.0 Points |
One of the three phases of benchmarking is:
|
A. conclusion. |
||||
|
B. postexecution. |
||||
|
C. reporting. |
||||
|
D. None of the above |
||||
|
Question 3 of 20 |
5.0 Points |
|||
The Five-Step Plan is the Japanese approach to implementing:
|
A. BCG matrix. |
||||
|
B. House of Quality. |
||||
|
C. Six Sigma. |
||||
|
D. Kaizen. |
||||
|
Question 4 of 20 |
5.0 Points |
|||
When benchmarking, it is not enough to understand the processes; they must be completely:
|
A. analyzed. |
||
|
B. tested. |
||
|
C. documented. |
||
|
D. integrated |
||
|
Question 5 of 20 |
5.0 Points |
The origin of what is now called __________ dates back to a book written by Dr. Walter Shewhart in 1931.
|
A. quality engineering |
||||
|
B. compliance management |
||||
|
C. statistical process control |
||||
|
D. QFD |
||||
|
Question 6 of 20 |
5.0 Points |
|||
Lean is based on the manufacturing system that was developed by:
|
A. Motorola. |
||||
|
B. Toyota. |
||||
|
C. Goldratt. |
||||
|
D. IBM. |
||||
|
Question 7 of 20 |
5.0 Points |
|||
The __________ phase of DMAIC focuses on why defects, errors, or excessive variation occurs.
|
A. Define |
||||
|
B. Measure |
||||
|
C. Analyze |
||||
|
D. Control |
||||
|
Question 8 of 20 |
5.0 Points |
|||
__________ approaches improvement projects in three successive phases, applying TOC, Lean, and then Six Sigma tools.
|
A. The iTLS model |
||||
|
B. Kaizen |
||||
|
C. CEDAC |
||||
|
D. SIPOC |
||||
|
Question 9 of 20 |
5.0 Points |
|||
__________ is founded on the premise that an organization’s performance against its goal can be determined and managed.
|
A. Kaizen |
||
|
B. JIT/Lean |
||
|
C. The Theory of Constraints |
||
|
D. Six Sigma |
||
|
Question 10 of 20 |
5.0 Points |
|
Which of the following individuals is identified as the developer of JIT/LEAN/Lean?
|
A. Eiji Toyoda |
||||
|
B. W. Edwards Deming |
||||
|
C. Taiichi Ohno |
||||
|
D. Henry Ford |
||||
|
Question 11 of 20 |
5.0 Points |
|||
Which of the following is NOT a measure in TOC?
|
A. Establishing the goal |
||||
|
B. Making the investment |
||||
|
C. Operating expenses |
||||
|
D. Throughput |
||||
|
Question 12 of 20 |
5.0 Points |
|||
Which of the following behaviors best describe the concept of benchmarking?
|
A. Unethical |
||||
|
B. Illegal |
||||
|
C. Industrial espionage |
||||
|
D. None of the above |
||||
|
Question 13 of 20 |
5.0 Points |
|||
Mass production is a(n) __________ system.
|
A. integrated |
||
|
B. push |
||
|
C. pull |
||
|
D. breakthrough |
||
Reset Selection
|
Question 14 of 20 |
5.0 Points |
Several benchmarking considerations require management’s approval before the process can start: commitment to change, funding, personnel, disclosure, and:
|
A. oversight. |
||||
|
B. direction. |
||||
|
C. involvement. |
||||
|
D. direct supervision |
||||
|
Question 15 of 20 |
5.0 Points |
|||
Variation in processes:
|
A. can be caused by include people, machines, material, and environment. |
||
|
B. is of three kinds. |
||
|
C. should not be of concern. |
||
|
D. must be eliminated if continual improvement is to happen. |
||
Reset Selection
|
Question 16 of 20 |
5.0 Points |
As part of its __________ responsibility, management in an organization that practices __________ must be personally involved in continual improvement.
|
A. leadership; fiscal responsibility |
||||
|
B. financial; leadership |
||||
|
C. leadership; total quality |
||||
|
D. fiscal; total quality |
||||
|
Question 17 of 20 |
5.0 Points |
|||
Six Sigma process performance:
|
A. represents a major advance in capability over the typical. |
||
|
B. has yet to be achieved in actual practice. |
||
|
C. predicts 1 nonconformance in 500 million opportunities. |
||
|
D. is useful only in large scale manufacturing. |
||
Reset Selection
|
Question 18 of 20 |
5.0 Points |
Six Sigma can only be achieved through:
|
A. hiring new staff. |
||||
|
B. process improvement. |
||||
|
C. creating a new mission statement. |
||||
|
D. cutting costs. |
||||
|
Question 19 of 20 |
5.0 Points |
|||
The JIT/LEAN/Lean “pull” system ensures that:
|
A. costs are minimized through “economy of scale.” |
||
|
B. the production line will never stop because of a problem. |
||
|
C. buffer stocks are on hand to prevent line stoppage when a critical machine fails. |
||
|
D. the internal supplier process does not build product unless told to do so by the internal customer process. |
||
Reset Selection
|
Question 20 of 20 |
5.0 Points |
The most common inhibitor of SPC is:
|
A. inadequate training. |
||
|
B. lack of resources resulting from the absence of management commitment. |
||
|
C. failure to have processes under control. |
||
|
D. low production rates. |
||