MAT 510
Homework Assignment 1
Due in Week 1 and worth 30 points
Save your time - order a paper!
Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines
Order Paper NowDescribe a work task, a hobby, or another
activity that you regularly do, and sequentially list the various actions you take
in order to complete this activity. You will need to repeat this activity to
see if the changes you engage in will assist in reducing the amount of time. Consider
the complexity of your list and the amount of steps required to complete the
activity. Choose an activity that you complete on a daily basis. Please
consider the choices below:
Preparing for a jog, workout, or other sports
related activity.
Cooking a meal or preparing a sandwich.
Making coffee in the morning.
Cleaning the house.
Washing the car.
Bathing/grooming your dog or cat.
Setting up a grill to BBQ.
Answer the following questions in the space
provided below:
- How
many steps did it take you to complete the activity? - What
time did each step take and how much time was delayed between steps? - What
was the average time between steps? - What
was the average time each step took? - Differentiate
the main actions between doing and improving your activities. - Determine
the overall manner in which variation has affected your activities. - Overall,
how much time were you able to cut down on when engaging in the same activity
while implementing the new changes?
To answer the questions
follow the example below. The main objective of this assignment is to
understand the difference between “doing and improving.”
Example for Assignment 1
Description of
activity: One
of my hobbies is cycling. I participate in fund raising events throughout the
year. These events require proper cycling attire and resources such as special
drinks to help with hydration and special snacks to maintain endurance and
eliminate the chances of my bonking during the ride. Below is a description of
my before and after attempts taken to improve the amount of time each step
took.
- How many steps did it take you to complete the activity?
It
took me 10 steps to complete the activity from waking up to arriving at the
cycling
event.
The event began at 7 am in the morning requiring I arrive by no later than 6:30
am.
Sleeping
as much as possible is important so I would like to save some time in the
morning
for sleep in lieu of having to get ready.
- What time did each step take and how much time was delayed
between steps?
Comparing the times between my first ride and
now, you can see I have managed to save
time by preparing ahead of
time.
- What was the average
time between steps?
In my case this is not applicable as the steps
are separated in purpose unlike making a sandwich or mean where steps are
interconnected.
- What was the average time each attempt took?
It took me 95 minutes to get out the door the
first time and 29 minutes to get out the door the second time. This resulted in
a 66-minute reduction in time from getting up to arriving at the event. The
first attempt took an average of 9.5 times and the second attempt took an
average of 2.9 times.
- Differentiate the main actions between doing and improving
your activities.
The initial cycling event I attended, I was a
novice and was unaware of how much time it takes me to get out the door to go
cycling. Since I was under a time constraint
- Determine the overall manner in which variation has
affected your activities.
The standard deviation for the two activities
were respectively 6.8 and 5.1 minutes
- Overall, how much time were you able to cut down on when
engaging in the same activity while implementing the new changes?
I was able to reduce my time by 66 minutes.
Name of activity:
Preparing for Cycling event upon awakening
| STEP |
Time (1st attempt) |
Time (2nd attempt) |
Difference |
|
Step 1: Finding a matching pair of cycling socks |
10 minutes |
0 minutes Located matching pair of socks |
10-minute reduction |
|
Step 2: Putting on cycling clothes |
5 minutes |
5 minutes Clothes laid out and ready |
0-minutes difference |
|
Step 3: Locating cycling shoes |
2 minutes |
0 minutes Loaded shoes in equipment bag |
2-minute reduction |
|
Step 4: Preparing drinks and snacks for long ride |
15 minutes |
0 minutes Prepper drinks and snacks day prior – just grab and go |
15-minute reduction |
|
Step 5: Packing all needed supplies |
2 minutes |
0 minutes Packed helmets, gloves, and shoes in bag and placed in car day prior |
2-minute reduction |
|
Step 6: Fill bicycle tires with air |
18 minutes |
0 minutes Prepped bikes day prior and also used maintenance area at the event |
18-minute reduction |
|
Step 7: Put Bike rack on the car |
5 minutes |
0 minutes Loaded bike rack day prior |
5-minute reduction |
|
Step 8: Loading bicycles onto bike rack |
4 minutes |
0 minutes Loaded bikes day prior |
4-minute reduction |
|
Step 9: Unloading bicycles and equipment needed during the ride |
14 minutes | 14 minutes | 0-minute change |
|
Step 10: Checking in and getting the riders packet |
Varies depending on arrival time. Earlier the faster processed 20 minutes |
Varies depending on arrival time. Earlier the faster processed 10 minutes |
10-minute reduction |
| Total time | 95 minutes total | 29 minutes |