You are a cellular biologist.  You have been investigating the perfect cell.  You must submit a proposal for your study to receive future monies from Seton Hall Biology Departmen

You are a cellular biologist.  You have been investigating the perfect cell.  You must submit a proposal for your study to receive future monies from Seton Hall Biology Department.

Your explanation must include:

1.  Draw, a model of the perfect cell and organ system in which this ideal cell will be a part.

2. Identify why this is a perfect cell and organ system in the human body

3.  Make sure you have at least one (1) reference to support your hypothesis

4.  Mention what kind of research method that would be best for this Cell project

5.  Provide in three sentences why your budget is necessary to support your research.

Remember, You must persuade the budget research committee of Seton Hall’s Biology department.  They are a rigorous academic group :>)

You can choose a format that shows learned skills from past modules, as well as this one.

This assignment should have a word count of a max. of 500 words but no less than 350 words.

If you draw your perfect cell and its associated organ system, you should scan and save it as a pdf or jpg, and insert it within your proposal.  The drawing should be included in your work.

If you use something from the Internet, you must cite the source.

The post You are a cellular biologist.  You have been investigating the perfect cell.  You must submit a proposal for your study to receive future monies from Seton Hall Biology Departmen appeared first on Infinitessays.org.

Please follow the instruictions carefully.

Please follow the instruictions carefully.

The post Please follow the instruictions carefully. appeared first on Infinitessays.org.

Hazardous Noise Case Study

Hazardous Noise Case Study

 

You have been hired as a consultant to help a local machine shop solve a hazardous noise problem. The shop is 10,000 square feet in area, with 12-foot high concrete block walls, and a flat metal roof. Inside the shop are two band saws, two metal lathes, three drill presses, one milling machine, and three abrasive grinders. The six employees work at benches located throughout the shop, using a variety of pneumatic-powered hand tools and non-powered tools. A recent noise survey found sound pressure levels exceeding 100dBA in some parts of the shop. All employees were monitored for noise exposure over an eight-hour workday, and the calculated TWA for noise for the employees ranged from 88dBA to 97dBA.

 

Using the Risk Assessment Matrix in Table 11 on page 122 of the course textbook, conduct an initial hazard analysis and risk assessment based on the information in the scenario provided. Discuss how you arrived at the risk level estimate.

 

Determine a possible control measure for each of the six levels in the hierarchy of controls on page 208 in the course textbook, and explain the reasoning behind each choice. For each of the selected control measures, reevaluate the original risk. In a summary paragraph, discuss the results and how the shop managers could determine which control measures would be required and which others might be beneficial to their operations.

 

Your paper must be a minimum of two pages in length, not counting cover page and references, and follow APA formatting for the paper, as well as for all references and in-text citations.

Draw the diagrams for surface water treatment and groundwater treatment. What are the two main differences between each treatment? 

1. Make a scheme to describe the municipal wastewater treatment systems? Add the removal BOD and solids rates for each treatment.

2. You have been asked to evaluate the ability of a horizontal –flow gravity grit chamber to remove a 0.015 cm diameter particle under winter and summer conditions. The particle density is 1.83 g/cm3 . The winter wastewater is 12 ºC. The summer wastewater temperature is 25 ºC. The depth of the grit chamber is 1.0 m. The detention time of the wastewater in the grit chamber is 60 s.

3. The town of Camp Verde has been directed to upgrade its primary WWTP to a secondary plant that can meet an effluent standard of 25 mg/L BOD5 and 42 mg/L suspended solids. They have selected a completely mixed activated sludge system for the upgrade. The existing primary treatment has a BOD5 of 240 mg/L. Using the following assumptions, estimate the required volume of the aeration tank a. BOD5 of the effluent suspended solids is 50% of the allowable suspendedsolids concentration b. Growth constants values are estimated to be: Ks = 100 mg/L BOD5 , Kd = 0.025/d, µm = 10/day, Y= 0.8 mgVSS/mg BOD5 removed c. The design MLVSS is 3,000 mg/L

4. Mention three differences between ground and surface water

5. Draw the diagrams for surface water treatment and groundwater treatment. What are the two main differences between each treatment?