.Which of the following does NOT usually function as an entry barrier? Economies of scale High strategic stakes

1.Which of the following does NOT usually function as an entry barrier?

Economies of scale
High strategic stakes
Product differentiation
Switching costs

2.A challenge in conducting an external analysis is that:

brand loyalty is low.
markets may be concentrated.
markets may be fragmented.
forecasts aren’t facts

3. A long-term contract is usually an agreement between:

two organizations in the same industry.
an organization and its suppliers.
two organizations in unrelated industries.
a domestic and international organization.

4.The product-market evolution matrix is based on the:

industry analysis.
product life cycle.
internal strengths and weaknesses.
opportunities and threats.

5.An organization’s __________ are its goal-directed plans and actions in which its capabilities and resources are matched with the opportunities and threats in its environment.

mission statements
vision statements
strategies
objectives

6.Characteristics of dynamic capabilities include all of the following EXCEPT:

timely responsiveness.
reactive responsiveness.
rapid and flexible product innovation.
coordinating and deploying organizational resources and capabilities.

7.__________ is an arrangement in which a foreign firm buys the rights to manufacture and market a company’s product in that country for a negotiated fee.

The post .Which of the following does NOT usually function as an entry barrier? Economies of scale High strategic stakes appeared first on Infinitessays.org.

Discuss the issues faced and the goals the business       expected accomplished.

  1. Student Internship      Evaluation.      The student will prepare a 10-15 page, double-spaced, word-processed report      describing practical work experience gained during the internship. The      report should be of professional quality and should include as a minimum:
    • What       was the organization attempting to accomplish?
      Provide a brief summary of the business, their products, state of their       information systems. Discuss the issues faced and the goals the business       expected accomplished.
    • What       steps or processes did you follow to accomplish the business’ goals for       you?
      Explain how you addressed the issues, what steps you followed, and how       you developed the deliverable.
    • What       were the results of your efforts?
      Explain how you applied the concepts learned in the classroom to your       project and what you accomplished. Define your measures of effectiveness       and how the results of your project met these measures.

The paper will be downgraded if the above points are not covered. The paper will also be graded on punctuation, grammar, and style. A review of a style guide such as The Elements of Style by Strunk & White will be well worthwhile.

Allocating specific, limited resources to specific activities is called: A. resource allocation.

Allocating specific, limited resources to specific activities is called:
A. resource allocation.

B. resource leveling.

C. resource tracking.

D. expediting a project.

Question 2 of 20 5.0 Points

The primary cause of concern in resource allocation is:
A. labor cost.

B. resource scarcity.

C. lack of solution methodologies.

D. parallel activities.

Question 3 of 20 5.0 Points

A project that cannot go over budget is considered:
A. time constrained.

B. schedule constrained.

C. resource constrained.

D. performance constrained.

Question 4 of 20 5.0 Points

The task duration with standard-practice resource usage is referred to as the:
A. expected task duration.

B. nominal task duration.

C. crash duration.

D. normal task duration.

Question 5 of 20 5.0 Points

A task has a normal duration of 9 days and crash duration of 7 days. Its normal cost is $40 and its crash cost is $100. What is the crash cost per day?
A. $140

B. $70

C. $50

D. $30

Question 6 of 20 5.0 Points

What is an expediting technique in which the design and planning phases of a project are not actually completed before the building phase is started?
A. resource loading

B. fast-tacking

C. crashing

D. critical path

Question 7 of 20 5.0 Points

Resource __________ refers to the amounts of specific resources that are scheduled for use on specific activities or projects at specific times.
A. expediting

B. leveling

C. loading

D. allocation

Question 8 of 20 5.0 Points

Which of the following priority rules makes resources available so that activities start on their LSTs whenever possible without increasing the project’s duration?
A. As soon as possible

B. As late as possible

C. Shortest task duration first

D. Minimum slack first

Question 9 of 20 5.0 Points

Which of the following rules maximizes the number of tasks that can be completed by a system in a given period of time?
A. As soon as possible

B. As late as possible

C. Shortest task duration first

D. Minimum slack first

Question 10 of 20 5.0 Points

Several projects can be linked together with:
A. virtual activities.

B. nominal activities.

C. pseudoactivities.

D. ER links.
Reset Selection

Mark for Review What’s This?
Question 11 of 20 5.0 Points

Which of the following is NOT commonly used to help select a priority rule?
A. Schedule slippage

B. Resource utilization

C. In-process inventory

D. Cost overruns
Reset Selection

Mark for Review What’s This?
Question 12 of 20 5.0 Points

Which of the following is a measure of the amount by which a project is delayed by application of a leveling rule?
A. Schedule inflation

B. Schedule progression

C. Schedule efficacy

D. Schedule slippage
Reset Selection

Mark for Review What’s This?
Question 13 of 20 5.0 Points

According to research, the best overall priority rule is:
A. as soon as possible.

B. as late as possible.

C. shortest task duration first.

D. minimum slack first.
Reset Selection

Mark for Review What’s This?
Question 14 of 20 5.0 Points

The practice of assigning project team members to multiple projects is called:
A. concurrent engineering.

B. parallel activities.

C. fast-tracking.

D. multitasking.
Reset Selection

Mark for Review What’s This?
Question 15 of 20 5.0 Points

The safety time added to chains other than the critical chain is called the:
A. feeding buffer.

B. project buffer.

C. path buffer.

D. critical buffer.
Reset Selection

The post Allocating specific, limited resources to specific activities is called: A. resource allocation. appeared first on Infinitessays.org.

A. To overcome the limitations associated with statistical techniques used to develop probability of completion time estimates

uestion 1 of 20 5.0 Points
What is a milestone?
A. A significant event in the project
B. A mark on a chart that depicts project progress
C. An activity on the critical path
D. An activity with an uncertain completion time
Reset Selection
Mark for Review What’s This?
Question 2 of 20 5.0 Points
What is project slack?
A. The amount of time a non-critical task can be delayed without making the project late
B. The amount of time the critical path of a project can be delayed without making the project late
C. The amount of time an activity on the critical path can be delayed without making the project late
D. The difference between how long the project would take if all tasks were completed based on their pessimistic versus optimistic time estimates
Reset Selection
Mark for Review What’s This?
Question 3 of 20 5.0 Points
For which purpose is simulation NOT used with regard to project scheduling?
A. To overcome the limitations associated with statistical techniques used to develop probability of completion time estimates
B. To investigate the range of project completion times
C. To investigate the distribution of project completion times
D. To verify the accuracy of the optimistic, pessimistic, and most likely time estimates
Question 4 of 20 5.0 Points
Technical dependencies on a project plan are easiest to see on a:
A. Gantt chart.
B. GERT chart.
C. PERT/CPM chart.
D. Work Breakdown Structure.
Question 5 of 20 5.0 Points
PERT was originally used for what type of project?
A. Construction
B. R & D
C. Military
D. Computer software development
Question 6 of 20 5.0 Points
Which of the following is NOT an element of the Gantt chart?
A. Actual progress
B. Variance of the critical path
C. The current date
D. Scheduled milestones
Question 7 of 20 5.0 Points
Which of the following is typically used as the best estimate of task duration?
A. Expected time
B. Pessimistic time
C. Optimistic time
D. Most likely time
Question 8 of 20 5.0 Points
Which of the following terms is most closely associated with a task required by the project?
A. Activity
B. Event
C. Milestone
D. Network
Question 9 of 20 5.0 Points
What is the expected time to complete a task with optimistic, most likely, and pessimistic times of 3, 4, and 7 days, respectively?
A. 3
B. 4
C. 4.3
D. 4.7
Question 10 of 20 5.0 Points
What is the standard deviation of a task with optimistic, most likely, and pessimistic times of 3, 4, and 7 days, respectively, assuming the estimates were made at the 99% plus level?
A. .444
B. .667
C. 1.212
D. 1.469
Question 11 of 20 5.0 Points
The amount of time a noncritical task can be delayed without delaying the project is called:
A. surplus.
B. flop.
C. slack.
D. critical time.
Question 12 of 20 5.0 Points
Slack is calculated as:
A. LFT – EST.
B. LFT – LST.
C. LST – LFT.
D. LFT – EFT.
Question 13 of 20 5.0 Points
Which of the following linkages is used to start two or more activities at the same time?
A. Finish-to-start
B. Start-to-start
C. Finish-to-finish
D. Start-to-finish
Question 14 of 20 5.0 Points
One shortcoming of the __________ network method is that it does not allow for leads and lags between two activities without greatly increasing the number of subactivities to account for this.
A. Gantt Chart
B. AON
C. MSP
D. PERT/CPM
Question 15 of 20 5.0 Points
An identifiable state resulting from the completion of one or more activities is called:
A. an event.
B. an activity.
C. a milestone.
D. a path.
Reset Selection
Question 16 of 20 5.0 Points
The major advantage of the Gantt chart is that it:
A. addresses all activities.
B. is easy to read.
C. highlights critical task of the project.
D. manages project scheduling.
Reset Selection
Question 17 of 20 5.0 Points
A(n) __________ is an identifiable state resulting from the completion of one or more activities.
A. path
B. milestone
C. critical path
D. event
Reset Selection
Question 18 of 20 5.0 Points
For any task on a critical path, its __________ must be the same as its __________.
A. LST; LFT
B. LFT; EFT
C. LST; EST
D. EST; EFT
Reset Selection
Mark for Review What’s This?
Question 19 of 20 5.0 Points
The amount of time a noncritical task can be delayed without delaying the project is called:
A. margin.
B. completion variance.
C. float.
D. variable duration.
Reset Selection
Mark for Review What’s This?
Question 20 of 20 5.0 Points
The square root of the variance of statistical distribution equals the __________ of that distribution.
A. standard deviation
B. normal probability
C. variance of the path
D. cumulative probability
Reset Selection

The post A. To overcome the limitations associated with statistical techniques used to develop probability of completion time estimates appeared first on Infinitessays.org.