Develop a statement of work for the project, using the format of (1) background, (2) task, (3) objectives, (4) approach, and (5) input source. You may refer to the Integrated Project in Chapter 2 on page 66 of the textbook for an example.

Develop a statement of work for the project, using the format of (1) background, (2) task, (3) objectives, (4) approach, and (5) input source.
 You may refer to the Integrated Project in Chapter 2 on page 66 of the textbook for an example.
c) Next, create a Work Breakdown Structure for the project. What are the key steps, including work packages, tasks, and any related subtasks for the project? You may refer to the Integrated Project in Chapter 5 on page 162 of the textbook for an example.
 d) Please use at least four fictional group members and create a Responsibility Matrix. You may refer to the Integrated Project in Chapter 5 on page 162 of the textbook for an example
QUESTION 2
This assignment consists of four parts. Please label each part of the assignment Part 1, Part 3, and Part 4 in the document, and insert a page break after each part.
: This assignment requires the use of MS Project or similar software. If you do not have MS Project or similar software, you may look for free or trial versions on the Internet
. Part 1: Develop an in-depth schedule for your initial project based on the Work Breakdown Structure you completed in  QUESTION 1.
 Please refer to the Integrated Project in Chapter 10 of the textbook on page 318 for more information. (40 points total) Be sure to include:
 1. An activity precedence diagram
2. An activity duration table
 3. A network diagram and Gantt charts (20 points)
 Part 3: Develop the network activity chart and identify the critical path for a project based on the information provided in the Gantt Chart Activity document.
To access the Gantt chart activity document, click here. (25 points total)
1. Draw the activity network as a Gantt chart. (20 points)
 2. What is the expected duration of the project? (5 points)
Part 4: Consider the project with the information provided in the Project Activity Network document.
 To access the Project Activity document, click here or on the link above.
1. Construct the project activity network using AON methodology and label each node
 2. Identify the critical path and other paths through the network.
Use the project you have been working on in QUESTION 1 and 2 to conduct a preliminary risk analysis of your project.
 Please use a qualitative and a quantitative technique to evaluate project risk. . Please see the sample risk analysis on page 224 in the textbook. A minimum of three typed pages is required.
1. Generate a set of likely risk factors, and discuss them in terms of probability and consequences.
 2. Use a qualitative technique to evaluate project risk.
3. Use a quantitative technique to evaluate project risk.
 4. Develop preliminary strategies for risk mitigation.
5. Create a Resource-leveling table for your assigned project. Please see complete description on page 378 in the textbook

 

PLACE THIS ORDER OR A SIMILAR ORDER WITH homework handlers TODAY AND GET AN AMAZING DISCOUNT

Save your time - order a paper!

Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines

Order Paper Now

get-your-custom-paper

The post Develop a statement of work for the project, using the format of (1) background, (2) task, (3) objectives, (4) approach, and (5) input source. You may refer to the Integrated Project in Chapter 2 on page 66 of the textbook for an example. appeared first on homework handlers .